Customization: | Available |
---|---|
Type: | R (Surfacing Electrode) |
Material: | Cast Iron |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
This welding rod is primarily intended for surfacing operations on heavily worn components as well as parts subjected to high-temperature wear, such as components of agricultural machinery and mining equipment that endure sand abrasion and light impact.
Pre-welding Preparation: Bake the electrode at 300-350ºC for 1 hour before use.
Worn Parts Treatment: Before surfacing wear components, remove the fatigue layer or treat it with water toughness.
Ventilation: Due to significant yellow smoke produced during surfacing welding, ensure adequate ventilation and operate in a well-ventilated area.
The slag produced is full and compact when hardened, making it easy to remove.
TYPICAL OPERATING PROCEDURES: (AC,DC)
Diameter (mm) | 3.2 | 4.0 | 5.0 |
Current (A) | 70-90 | 100-140 | 150-180 |
Items | C | Mn | Si | Cr |
Requirements | 4.50 | 0.6 | 1.8 | 23.5 |
Q1: Can I have a sample for testing?
A: Yes, we can support free sample.
Q2: Can I add my logo on the boxes/cartons?
A: Yes, OEM and ODM are available from us,for the MOQ for OEM/ODM talk with us please.
Q3: What are the benefits of being a distributor?
A: Special discount Marketing protection.
Q4: Do you have inspection procedures for welding wires and welding electrode?
A: 100% self-inspection before packing. We provide Quality Certification for every order.
Q5: Can we mix itmes in one 20FT container?
A: Yes,welding wire and welding electrode can mix them in one container.
Q6: Can I have a visit to your factory before the order?
A: Sure, welcome your visit of factory, or we can have a online meeting for factory inspection.
Q7: What is the lead time for samples and mass production?
A: Samples can be ready within 3-5 working days. For mass production, it usually takes 15-25 working days, depending on the order quantity and customization requirements.
Q8: What payment terms do you accept?
A: We accept T/T (30% deposit in advance, 70% balance against B/L copy), L/C at sight, and Western Union for small orders. Other terms can be negotiated for long-term cooperation.